Nasdude4856 Nasdude4856
  • 11-02-2024
  • Engineering
contestada

Which bid specification type provides the vendor with maximum latitude to determine how to satisfy the bid requirement?
a) Performance specifications
b) Design specifications
c) Functional specifications
d) Generic specifications

Respuesta :

Otras preguntas

why is it summer in the usa and winter in argentina
jay needs 19 quarts more paint for the outside of his barn than for the inside. If he uses 107 quarts in all, how many gallons of paint will be used to paint th
The legs of a right triangle have lengths of 4 and 5 units. Find the length of the hypotenuse
The People’s Party supported fighting deflation by circulating A) more paper currency. B) more silver coins. C) fewer silver coins. D) fewer gold coins.
Which is most true of Jim Crow laws?
when designing a roller coaster what are the biggest considerations?
The floor of a rectangle room will be tiled with
Just one says when you put together on equal groups you can only add is he correct
Choose the correct Spanish subject pronoun for the English subject pronoun provided. We (all females) ellos ellas nosotros nosotras
what is the "it" in the sentence join them for it