boogyman7255 boogyman7255
  • 12-02-2024
  • Engineering
contestada

The NFPA 704 fixed facility markings are ______-shaped signs.
a) Diamond
b) Circle
c) Square
d) Triangle

Respuesta :

Otras preguntas

What is the potential energy of a 3 kilogram-ball that is on the ground?
what is 7/12 as a percent?
in a given training week a swimmer completes 1/4 mile on day one 2/5 mile on day two    and 3/7 mile on day three,,
A sailboat has a mast that holds a triangular sail.The sail has a base of twelve meters and a height of nine meters. The cost of the sail is $15 per square mete
The sum of Alan’s age and Bob’s age is 40. The sum of Bob’s age and Carl’s age is 34. The sum of Alan’s age and Carl’s age is 42. How old is Bob?
How much work does a mother do if she lifts each of her twin babies upward 1 meter? Each baby weighs 90 newtons.
How can I split five brownies between three people
How do I write n+5n= 12c-c= and -4j-1-4j+6= in simplest form?
Calculate the average speed of a bicycle that travels 100m in 20 s.
A force of 200 N is required to keep an object sliding at a constant speed of 2 m/s across a rough floor. How much power is being expended to maintain this moti