williamsjasmine williamsjasmine
  • 10-05-2016
  • Mathematics
contestada

If 4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Respuesta :

juju3911
juju3911 juju3911
  • 10-05-2016
8 people could stain a deck in one day.
Answer Link
littlemojo101
littlemojo101 littlemojo101
  • 10-05-2016
the answer to this is 8
Answer Link

Otras preguntas

how do u learn multiplication fast
1. What animals dominated the Mesozoic Era? A. dinosaurs B. fish C. mammals D. amphibians 2. One group of reptiles, characterized by the fossil Archaeo
If h = 3.7 then what is 0.8 + h?
true or false the earth loses energy to space only at night
Which of the following best represents potential energy being converted to kinetic energy? A. A man jogs and stops to drink an energy drink. B. A drawn bow
I need help with the simplified form of 1/2(-14m+36)
La escuela de Jorge tiene muchas __________ extracurriculares.
the act of fulfilling one's ambitions, desires, etc., through one's own efforts is _____.
A scientist carries out an experiment on a hamster. He exposes the hamster to x-rays at regular intervals. This results in a germ line mutation in the hamster.
0.000000000093 in scientific notation