Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

Divide Rs240 in the ratio 3:5
What made the Hellenistic Age unique?
Which is not a claim that Kennedy made? Please help me I will give the brainless to who ever answers first and is right
refer to the map What was the name of the region occupied by native Americans that bordered the atlantic ocean​
What is the perimeter of ΔBDE? a) √17 + √26 + 5 b) 4 √2 + √65 + 5 c) √34 + √65 + 5 d) √17 + 4 √7 + 2 √3
Human Energy vs. Insect Energy. For its size, the common flea is one of the most accomplished jumpers in the animal world. A 2.0-mm-long, 0.50-mg flea can reach
what did the morrill land grant provide
Which statements about local and global winds is true
what is the only day that congress has to meet(at a minimum) annually?​
what is 3y - x = 10 in slope intersept form