pinkplum5955 pinkplum5955
  • 11-03-2021
  • Mathematics
contestada

It takes one week for a crew of workers to pave 3/5 kilometer of a road. At that rate, how long will it take to pave 1 kilometer?

Respuesta :

ayfat23
ayfat23 ayfat23
  • 12-03-2021

Answer:

1.67 weeks

Step-by-step explanation:

Let X= time it will take to pave 1 kilometer?

1 week=3/5 kilometer

X week =1 kilometer

Cross multiply

3/5 X= 1

3X= 5

X= 5/3

1.67 weeks

Answer Link

Otras preguntas

3. What can you use to measure area? Include examples please
Traditional Chinese writing is arranged in vertical columns that are read from top tobottom. Is it coordination,subordiantion,or parallelism?
Give a rule to the function. {(2,5), (3,10), (4,17), (√3, 4)}
What is 2/5 plus 1/3
Where did the dominoes originate before spreading throughout the Spanish-speaking world?
an organelle that appears as a stack of flattened membranes; it modifies, sorts, and packages proteins and other materials from the ER for storage in the cell o
if you leave a wet paper towel out on a counter,it will eventually dry. which change of state causes this?
In October, Greg and Thomas had the same amount of money in their savings accounts. In November, Greg deposited $120 into his account. Thomas increased the mone
What elements do alkaline earth metals react with
how do you say "the golden one" in spanish