grandemilenaa06 grandemilenaa06
  • 12-03-2021
  • Mathematics
contestada

if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming that all the men are working at the same rate?

Respuesta :

irspow
irspow irspow
  • 12-03-2021

Answer:

Step-by-step explanation:

8t=9(4)

8t=36

t=4.5

So it will take 4.5 days for 8 men to finish the job.

Answer Link

Otras preguntas

Identify the spectator ions in this reaction. Check all that apply. H+ + CN– + Li+ + OH– mr001-1.jpg Li+ + CN– + H2O H+ CN– Li+ OH– H2O
When romance lasts beyond the four-year mark, which chemicals give lovers a sense of security, peace, and calm?
The bolts that hold the cables on Trudi's bike measure about 0.12 inches across. She has a set of wrenches in these sizes, measured in fractions of an inch: 5/3
Can someone explain to me how to do question number 6 please?
Which is one of the 3 animals that blocks dantes path when he first wakes up in the forest?
In the portrait mode your camera will automatically use the smallest apeture possible
What did kennedy's successor lyndon johnson set out to do upon becoming president?
in which number is the value of the 7 ten times the value of the 7 in the number 1273?
I need someone to pt the verbs in this paragraph into Preterite form. Mi familia y yo necesitar comer. Mi la casa el telfono ir, el turno el anillo el anillo.
What is the main function of the pancreas?