tomdarren2449 tomdarren2449
  • 11-06-2021
  • Business
contestada

What is the total cost to move products between work centers A and D, and between work centers B and C combined

Respuesta :

Munali Munali
  • 14-06-2021

Answer:

More than $0 but less than or equal to $100.

Explanation:

The transportation cost is $2.

Load summary is AB = 12, AC = 25, AD = 12, BC = -19, BD = 21, CD = 34.

The total cost to move product between A and D and B and C combined is ;

A and D = 12 * $2 = $24

B and C = 19 * $2 = $38.

Answer Link

Otras preguntas

What is 2% as a fraction in simplest form
Divide 72 rolls into 2 groups so the ratio is 3 to 5.
consumer math help!!!??????? Pic attached
Would the friction force increase, decrease, or stay the same if Marco added two more blocks to the sled or wagon? Explain your answer.
55:100 66:120 are these ratios equivalent ?
A collector has 120 movies posters and 100 band posters. She wants to sell movie posters but still have her poster collection maintain the same ratio of 120: 10
HELP!! Alex says that if he rolls an odd number on the first number cube, it is more likely that he will roll an even number on the second number cube. Is he c
at a pet store the ratio of cats to dogs sold was 10:1 if there were 60 cats that were sold how many dogs were sold?
Help Use the Distributive Property and simplify the expression. 4 + 2(3x – 1) + 9 A. 5x + 14 B. 6x + 11 C. 3x + 14 D. 6x + 15
what is x equal to when 2x+5=13