abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

Is this statement true or false? Minuteman by Daniel Chester French is a patriotic American sculpture.
If a time traveler visited the Byzantine Empire in the late 11th century, what sign of decline would he or she see? (5 points) a) loss of the Balkan provinces
. A dinner plate has a circumference of 119.32 cm. What is the area of the dinner plate? (Use 3.14 for .)
Solve the system by the elimination method. 2x + 3y - 10 = 0 4x - 3y - 2 = 0
Which statement is true about the determinant of a matrix?
If f has a local maximum value at x = a, what would you expect the graph of f ' to look like near x = a? The graph of f ' should be above the x-axis, cross the
Food engineering is a field that focuses on
What is a spreadsheet program? A spreadsheet program is a computerized version of_________.
The table below shows the ticket rates for whale watching trips offered by Ocean Tours: Age Ticket Price Under 3 years free 3 to 12 years $36 Over 12 years $4
ow did the Roman government keep poor Romans from rebelling? PLEASE HELPPPP