gabbygarciaanay6629 gabbygarciaanay6629
  • 11-01-2018
  • Health
contestada

The most realistic estimate of the time required to complete an activity is referred to as​ what?
a. slack time
b. optimistic time
c. most likely time
d. pessimistic time

Respuesta :

sydneybottom
sydneybottom sydneybottom
  • 11-01-2018
I would say B. optimistic time
Answer Link

Otras preguntas

Robert collected 330 aluminum cans. If 100 aluminum cans weigh 4 pounds and the recycling center is paying 25 cents a pound, how much will Robert be paid for hi
Caleb rides his motorcycle with a constant speed of 72km/h. How far can he Travel in 3 hours 40 minutes
what else besides courses should be considered when making a academic plan?
Pinckney's Treaty with Spain finally solved the problem of: the boundary between the United States and West Florida the capture of American sailors payment for
Why do you think the Europeans supported the colonists rather than Great Britain?
which is the last step in conducting a url search
0.003% as a fraction
What tone does this passage convey? No matter how many times Jaime failed, he would try again. He knew if he just kept practicing, he would eventually succeed.
what was or is the goal of Manifest Destiny
10.5 in the form a/b