alcatrazmango3664 alcatrazmango3664
  • 10-02-2020
  • Social Studies
contestada

In slab placement, what comes directly before concrete floating? Select one: a. Formwork placement b. Curing c. Troweling d. Pouring e. Strike-off

Respuesta :

bratislava bratislava
  • 11-02-2020

Answer:

e. Strike-off

Explanation:

  • The precast suspended slabs are considered by pouring the slabs in a framework of the slabs and then lifting the slabs into suspended postilions in the structure.
Answer Link

Otras preguntas

in the election of 1912 teddy roosevelts bull moose party platform was built arond what he called the
x+y=14 2x+3y=38 what is x and y
2929.87 = , > , or < 2929.087
how long does it take to drive 272 miles going 68mph
6 2/3 quarts equals how many 2/3 cups
Which of the following New England colonies was the least successful as a trade center? Boston, because its harbor was not as good as Plymouth’s New Haven, beca
How did dynasties affect Egyptian government?
A researcher has a plant that displays yellow flowers, the trait dominant over white flowers in the species. How might the researcher discover if his plant is h
Fabio and Carlos play on a basketball team together. In the last game, Fabio had 7 points less than 2 times as many points as Carlos. Fabio scored 31 points in
You can buy 3 apples at the quick market for $1.26. You can buy 5 of the same apples at Stop and Save for $2.35. which place is the better buy?